Search found 9 matches
- Tue Jun 18, 2013 2:57 pm
- Forum: SMILE
- Topic: Joint Probability of a subset of non-evidence nodes
- Replies: 1
- Views: 2683
Joint Probability of a subset of non-evidence nodes
Hi I wanted to compute the JP for a subset of the non-evidence nodes. (Similar to MAP, But I dont want only the Maximum, but all) Since in the GetJPts we may ''get more than one JPT for given node, depending on the triangulation performed during jointree construction'' Can we somehow restrict it to ...
- Tue Jun 18, 2013 2:26 pm
- Forum: GeNIe
- Topic: Max data size for Learning Params?
- Replies: 1
- Views: 2749
Max data size for Learning Params?
Hi I have 30,610,500 data vectors with 20 attributes each (No missing values). Domain knowledge is used to express the qualitative part of the BN. However I wanted to use the data to quantify the network. I tried using Genie, but it crashed. :shock: Genie was able to read the data file and when I 'l...
- Wed Mar 27, 2013 3:56 pm
- Forum: SMILE
- Topic: Joint Probability
- Replies: 9
- Views: 8096
Re: Joint Probability
We are building a network for forensic applications..
So I wanted an exact inference algo!
Any way out?
So I wanted an exact inference algo!
Any way out?
- Wed Mar 27, 2013 3:43 pm
- Forum: SMILE
- Topic: Joint Probability
- Replies: 9
- Views: 8096
Re: Joint Probability
I am not sure if I completely understood how to go about with it. I have attached the test code which I used, after it didn't work for my network. The vecJPTs vector is always empty. (I tried even initializing it to some values but after the GetJpts function call it becomes empty. So I guess there i...
- Thu Mar 14, 2013 3:36 pm
- Forum: SMILE
- Topic: SMILE with VS 2005 Runtime Error
- Replies: 3
- Views: 4239
Re: SMILE with VS 2005 Runtime Error
Yup I did...
- Thu Mar 14, 2013 2:27 pm
- Forum: SMILE
- Topic: SMILE with VS 2005 Runtime Error
- Replies: 3
- Views: 4239
SMILE with VS 2005 Runtime Error
Hi I need to use VS 2005 (for stupid administrative reasons) with SMILE. After linking the library to the project. [Hopefully the link to the library is correct, since I checked the process with VS 2010 on my personal machine and its running perfectly) I can successfully build it. However when I try...
- Wed Mar 06, 2013 9:40 am
- Forum: SMILE
- Topic: Joint Probability
- Replies: 9
- Views: 8096
Re: Joint Probability
Hi
I was wondering if the joint inference is available in package
Visual Studio 2010 / VC 10.0 SP1
15.6 MB, September 15, 2012
I was wondering if the joint inference is available in package
Visual Studio 2010 / VC 10.0 SP1
15.6 MB, September 15, 2012
- Tue Mar 05, 2013 2:52 pm
- Forum: SMILE
- Topic: Joint Probability
- Replies: 9
- Views: 8096
Re: Joint Probability
We are working with VS 2010/Win 32
- Tue Mar 05, 2013 2:06 pm
- Forum: SMILE
- Topic: Joint Probability
- Replies: 9
- Views: 8096
Joint Probability
Hi We have a Bayesian network, in which we want to compute the joint probability distribution of the class nodes (more than 1) given a set of evidence (feature) nodes. We need to calculate the joint distribution, since we want to obtain the likelihood ratio of a certain combination of classes. Are t...